Milestone #21
Closed
[devops] Integração contínua dos pacotes
Progress: 2 closed – 0 open 100% complete
Unstarted Issues (open and unassigned)
- Drag and drop available
Ongoing Issues (open and assigned)
- Drag and drop available
Completed Issues (closed)
- #53 Integração contínua para pacotes do Gitlab
- #52 Integração contínua para pacotes do Colab
- Drag and drop available
Work in progress (open and unassigned)
- Drag and drop available
Waiting for merge (open and assigned)
- Drag and drop available
Declined (closed)
- Drag and drop available
Merged