Milestone #109
Closed
expired at Jan 08, 2016
[front-end] Implementação do layout das páginas do Portal do SISP - Tema do SISP
Progress: 5 closed – 0 open 100% complete expired at Jan 08, 2016
Unstarted Issues (open and unassigned)
- Drag and drop available
Ongoing Issues (open and assigned)
- Drag and drop available
Completed Issues (closed)
- #480 Aplicar design proposto para catálogo de ativos de software
- #617 Implementar design proposto para homepage do Portal de ativos de software
- #481 Aplicar design proposto para página de software de ativos de software
- #486 Aplicar design proposto para cabeçalho e rodapé do Portal de ativos de software
- #476 Prototipação inicial do catálogo de ativos de software e página dos software
- Drag and drop available
Work in progress (open and unassigned)
- Drag and drop available
Waiting for merge (open and assigned)
- Drag and drop available
Declined (closed)
- Drag and drop available
Merged