Milestone #16
Closed
[devops] Planejar Aumento de cobertura de testes de integração
Progress: 2 closed – 0 open 100% complete
Unstarted Issues (open and unassigned)
- Drag and drop available
Ongoing Issues (open and assigned)
- Drag and drop available
Completed Issues (closed)
- #36 Integração contínua para pacotes do Noosfero
- #42 Levantamento de problemas de implantação
- Drag and drop available
Work in progress (open and unassigned)
- Drag and drop available
Waiting for merge (open and assigned)
- Drag and drop available
Declined (closed)
- Drag and drop available
Merged