08 Jul, 2015
2 commits
-
Now the repository name should be globally unique, instead of restricted to the project scope Also updated the travis script to use the new version of kalibro_processor
-
Signed-off-by: Daniel Miranda <danielkza2@gmail.com>
06 Jul, 2015
2 commits
-
This enables the acceptance tests for repository index to pass. Fixed a missing translation for Project index. Signed off by: Diego Araújo <diegoamc90@gmail.com>
-
There should be a repository link at the home page. It should take the user to the page with all the repositories. A project should not list independent repositories. Signed off by: Rafael Reggiani Manzo <rr.manzo@gmail.com>
22 Jun, 2015
1 commit
17 Jun, 2015
1 commit
-
new and create action can be acessed both with or without a project. This enables to have repositories the two ways. The behaviour for the back had to change from going back to a specific project page. To the all projects pages since some repositories may not have a project_id. With the routes, many helpers had to get fixed together with acceptance tests steps (for this a new step was created in order to be able to create RepositoryAttributes). Finally the JS for repository state retrieval needed fixes since it builds the route withot any helper. Same thing for the JS that prevents infinite state queries. Signed off by: Rafael Reggiani Manzo <rr.manzo@gmail.com>
21 May, 2015
1 commit
-
…ng the kalibro configurations list Before they were not loaded leading to a exception when redering the edit view again.
29 Apr, 2015
1 commit
-
Signed off by: Diego Araújo <diegoamc90@gmail.com>
17 Apr, 2015
4 commits
-
signed off by: Rafael Reggiani Manzo <rr.manzo@gmail.com>
-
Missing date_select.feature
-
Missing actions for menu selection Signed off by: Daniel Miranda <danielkza@gmail.com>
-
Also changing the other accpetance tests to include the new translations Signed off by: Diego Araújo <diegoamc90@gmail.com>
06 Apr, 2015
1 commit
-
Signed off by: Rafael Manzo <rr.manzo@gmail.com>
25 Feb, 2015
1 commit
-
Signed off by: Diego Araújo <diegoamc90@gmail.com>
19 Feb, 2015
1 commit
-
Signed off by: Diego Araújo <diegoamc90@gmail.com>
12 Feb, 2015
11 commits
-
Repository metric results waiting for kalibro configurations integration Signed off by: Daniel Paulino Alves <danpaulalves@gmail.com>
-
We are missing the date selection and metric history features (which were wiped on cucumber) kalibro_client was updated Waiting for PR: https://github.com/mezuro/kalibro_processor/pull/76 Which is expected to fix the metric history graph Signed off by: Daniel Paulino Alves <danpaulalves@gmail.com> Signed off by: Heitor Reis Ribeiro <marcheing@gmail.com>
-
Signed off by: Daniel Alves <danpaulalves@gmail.com>
-
Also refactored Project's factory Signed off by: Daniel Alves <danpaulalves@gmail.com>
-
Fixed kalibro_configurations factory
-
Signed off by: Diego Araújo <diegoamc90@gmail.com>
-
Signed off by: Daniel Alves <danpaulalves@gmail.com>
-
Signed off by: Diego Araújo <diegoamc90@gmail.com>
-
Signed off by: Diego Araújo <diegoamc90@gmail.com>
-
Otherwise, ActiveResource requests would look for the unexistent route /mezuro_configurations instead of /kalibro_configuration which is the route expected by KalibroConfigurations webservice.
07 Dec, 2014
1 commit
26 Sep, 2014
2 commits
-
…onfiguration. Signed-off-by: Larissa Rodrigues <larissax55@gmail.com> Signed-off-by: Vinicius Franco <viniciusf.arantes@gmail.com>
07 Aug, 2014
1 commit
05 Aug, 2014
1 commit
25 Jun, 2014
1 commit
22 Apr, 2014
1 commit
29 Mar, 2014
2 commits
26 Feb, 2014
1 commit
19 Feb, 2014
1 commit
-
When building range factory. signed-off-by: Renan Fichberg <rfichberg@gmail.com>
28 Jan, 2014
1 commit
27 Jan, 2014
1 commit
-
Signed off by: Rafael Reggiani Manzo <rr.manzo@gmail.com>
16 Dec, 2013
1 commit
-
Calendar is used in show page to switch between processings Signed-off By: Fellipe Souto Sampaio <fllsouto@gmail.com>