Commit fe6b39d5cfe8a1509994c4196106c2a2f9c64e54
1 parent
50436066
Exists in
master
and in
3 other branches
Replace 'PSPB' by 'SPB Portal'
This makes the pipeline description consistent with the context description term first use.
Showing
1 changed file
with
5 additions
and
5 deletions
Show diff stats
ieeeSW/releaseEng3/IEEE_ThemeIssue_ReleaseEng_CD.md
| ... | ... | @@ -135,15 +135,15 @@ Only after all tests passed we move to the next step down the pipeline. |
| 135 | 135 | ### Preparing a new release |
| 136 | 136 | |
| 137 | 137 | Our release system was divided into two perspectives: the application and the |
| 138 | -PSPB. The application tag refers to the specific feature or bug fix and is a | |
| 139 | -monotonically increasing. A new tag on any system yielded a new PSPB tag. | |
| 138 | +SPB Portal. The application tag refers to the specific feature or bug fix and is a | |
| 139 | +monotonically increasing. A new tag on any system yielded a new SPB Portal tag. | |
| 140 | 140 | |
| 141 | 141 | When all tests passed for a given component, we manually created a new |
| 142 | 142 | application tag for it. As a consequence, that automatically created a new tag |
| 143 | -for the PSPB. Notice that we have forks of the original softwares and, as | |
| 143 | +for the SPB Portal. Notice that we have forks of the original softwares and, as | |
| 144 | 144 | consequence, we had different tag values. Packaging |
| 145 | 145 | |
| 146 | -The PSPB platform is running under the CentOS GNU/Linux distribution. | |
| 146 | +The SPB Portal platform is running under the CentOS GNU/Linux distribution. | |
| 147 | 147 | Basically, packaging a software for that distribution has three steps: (1) |
| 148 | 148 | write the script for the specific environment (RPM), (2) build the package, and |
| 149 | 149 | (3) upload it to a package repository. We chose to package our components for |
| ... | ... | @@ -181,7 +181,7 @@ The VE was used by the government agents to validate new features and required |
| 181 | 181 | changes. Also, the VE was useful to verify the integrity of the entire portal |
| 182 | 182 | as part of the next step in the pipeline. Acceptance Tests |
| 183 | 183 | |
| 184 | -After we completely deploy a new PSPB version in the VE, the government agents | |
| 184 | +After we completely deploy a new SPB Portal version in the VE, the government agents | |
| 185 | 185 | are responsible for checking features and/or bug fixes required by them. If the |
| 186 | 186 | technicians identify a problem, they notify the developers, the problems are |
| 187 | 187 | fixed and the pipeline restarts from scratch. If everything is validated, we | ... | ... |